Bow water tight bulkhead being connected to
sides. Side plate going on near scaffolding. Propeller blade on left. |

Stern sections – main deck – at right is
hole left for engine installation. |

Water tank at bow being enclosed. Side plate
up to bulkhead. |

Looking towards stern from gantry crane main
deck hatches being installed. |

Water tank at bow enclosed. |
Bow
water tight bulkhead and hull plates being assembled. |

Stern completed/Long ramp to main deck for
workers to walk on. |

Stern section – Note pocket for stern
anchor. |

Bow plates and supports being completed. |

Duplicate delete |

Prefabricated section going on board. |

Stern deck – Note holes for stair wells from
below. Also large sections to allow for engine and other propulsion
equipment to be installed. |

Name being pained on stern – propeller in
place. |

Not the Fitz |

Earlier in the building, 2nd
water tight bulkhead is in place.
Prefabricated support sections in foreground. Layout table on left where
sections are assembled. |