![fitzbuild32](thumbnails/fitzbuild32.jpg)
Bow water tight bulkhead being connected to
sides. Side plate going on near scaffolding. Propeller blade on left. |
![fitzbuild33](thumbnails/fitzbuild33.jpg)
Stern sections – main deck – at right is
hole left for engine installation. |
![fitzbuild34](thumbnails/fitzbuild34.jpg)
Water tank at bow being enclosed. Side plate
up to bulkhead. |
![fitzbuild35](thumbnails/fitzbuild35.jpg)
Looking towards stern from gantry crane main
deck hatches being installed. |
![fitzbuild36](thumbnails/fitzbuild36.jpg)
Water tank at bow enclosed. |
Bow
water tight bulkhead and hull plates being assembled. |
![fitzbuild38](thumbnails/fitzbuild38.jpg)
Stern completed/Long ramp to main deck for
workers to walk on. |
![fitzbuild39](thumbnails/fitzbuild39.jpg)
Stern section – Note pocket for stern
anchor. |
![fitzbuild40](thumbnails/fitzbuild40.jpg)
Bow plates and supports being completed. |
![fitzbuild41](thumbnails/fitzbuild41.jpg)
Duplicate delete |
![fitzbuild42](thumbnails/fitzbuild42.jpg)
Prefabricated section going on board. |
![fitzbuild42b](thumbnails/fitzbuild42b.jpg)
Stern deck – Note holes for stair wells from
below. Also large sections to allow for engine and other propulsion
equipment to be installed. |
![fitzbuild43](thumbnails/fitzbuild43.jpg)
Name being pained on stern – propeller in
place. |
![fitzbuild53](thumbnails/fitzbuild53.jpg)
Not the Fitz |
![fitzbuildn](thumbnails/fitzbuildn.jpg)
Earlier in the building, 2nd
water tight bulkhead is in place.
Prefabricated support sections in foreground. Layout table on left where
sections are assembled. |